Geothermal Loop Scheduling For Oklahoma New Construction
Loop scheduling is the part that goes wrong on new builds. Call me early and I will fit the loop to your build calendar.
4.8 stars, 300+ Google reviews. IGSHPA Accredited. Estimates on a new system are free.
I get the same call from builders every spring. The buyer wants geothermal, the slab is scheduled in a few weeks, and nobody talked to me before now. I can usually still make it work, but every day closer to that pour date narrows my options and raises the price. A geothermal loop is buried pipe, and buried pipe has to go in while the ground is open, so if geothermal is anywhere on the spec sheet for a build you’re running, the loop needs to be part of your schedule from excavation forward, not something you circle back to once the house is framed.
Where The Loop Fits In Your Build Schedule
Loop work lines up with excavation and site prep, ahead of the foundation forms. Here’s how I sequence it:
| Build Phase | What Happens With The Loop |
|---|---|
| Excavation / Site Work | Trenching or vertical bore drilling while the lot is open ground, then pressure testing before it’s covered |
| Before The Slab Pours | Tonnage, loop type, and header pipe entry point are locked in, sleeves set before concrete goes down |
| Foundation / Slab | Slab pours over the sleeves already in place, mechanical room location fixed |
| Rough-In | Interior header piping runs to the mechanical room alongside the HVAC and plumbing rough-in crews |
| Final | Heat pump equipment is set, the loop is purged and pressure tested again, and the system is commissioned before your final walkthrough |
Scheduled this way, the loop runs parallel to site work you’re already doing. It only becomes a critical path item, something that pushes your framing date, when it gets scheduled late.
What Has To Be Decided Before The Slab Pours
A handful of decisions have to be locked before the slab goes down, because once concrete is cured, changing any of them means cutting concrete or moving your mechanical room. First is tonnage, from a load calculation run off the house plans, since a loop runs roughly 200 bore feet per ton and drillers bill by bore feet, not the pipe feet inside the hole. Second is loop type: horizontal trench field or vertical bore field, which comes down to lot size and setbacks more than anything else. Third is where the header pipes enter the house, a point I coordinate with your foundation contractor so the sleeve is set before the pour instead of cut through cured concrete later. Fourth is where the mechanical room sits, since the interior run needs to be short and direct. The estimate on the system itself is free, so there’s no cost to nailing these four down early.
Why Waiting Until After Landscaping Costs You More
I get asked most seasons whether geothermal can wait until the house is finished: sod down, driveway poured, landscaping in. Technically, yes. Practically, it gets expensive fast. A drill rig or trencher needs open, unobstructed access across the lot, and once that lot has a finished driveway, irrigation lines, a septic field, and fencing, that access is gone. Retrofitting a loop after the fact usually means tearing out and later replacing some of what you just landscaped, routing around obstacles that weren’t there during site work, and paying for both the drilling and the repair of everything it disturbs getting there. The same loop that’s one line item during site work can cost multiples of that once the yard is finished, which is why I push builders to make the call before ground gets broken, not after.
I Bring In A Driller I Trust, I Don’t Own A Rig
I don’t own a drill rig, and I won’t tell a builder I do. Boring a vertical loop field is its own specialized trade, with its own equipment and its own state licensing, and I bring in a driller I trust to handle that part of the job. What I own is the design, the tonnage calculation, the heat pump equipment, the connection into your mechanical system, and the scheduling coordination that keeps the driller’s crew lined up with your framing crew, so nobody on your job stands around waiting on somebody else.
Oklahoma’s Driller Licensing And Well Construction Rules
Oklahoma doesn’t let just anyone drill a geothermal well. The Oklahoma Water Resources Board requires a commercial driller and plugger license to drill or plug wells used for heat exchange, covering both heat pump wells and geothermal wells specifically. The state also sets minimum construction standards for those wells, covering the borehole, casing, and grouting, so the well protects groundwater instead of creating a path for contamination between zones. That license sits with the drilling contractor, not me. The loop and installation design follow the standard published by IGSHPA, the International Ground Source Heat Pump Association, and I hold the IGSHPA Accredited credential myself.
Rebates And Incentives Worth Planning For
While I’m planning the loop with you, it’s worth planning the incentives too, since some depend on equipment choices made before installation, not after. OMPA, the Oklahoma Municipal Power Authority, pays up to $800 per cooling ton on qualifying geothermal installations, but only for customers of an OMPA member municipal utility. Kingfisher, Okeene, and Watonga are municipal, not co-op. Most of Oklahoma isn’t, and participation varies, so I check the serving utility before anybody budgets a rebate. That’s a cap, not a guarantee, and it requires a desuperheater, so I build that into the equipment list up front if a buyer wants to chase it. In Alfalfa Electric Cooperative territory, Garfield or Major County, the rebate runs $1,050 per ton for ground source versus $150 per ton for air source replacing gas or propane, which by itself gets a lot of builders in that territory asking about geothermal. If cost is the barrier, financing is available through Synchrony, Wells Fargo, Wisetack, Klarna, and JB Financing, and it can cover the system, not only the loop.
Why Builders Call Me For This
I’ve done HVAC work for 47 years, the last 15-plus running my own shop out of Kingfisher, and geothermal sequencing on new construction is where I field the most builder questions. Hartzell’s Heat & Air carries a Master HVAC License, I’m IGSHPA Accredited, and I work as a ClimateMaster GeoElite dealer. 4.8 stars, 300+ Google reviews back up how the jobs actually run.
Frequently Asked Questions
Can geothermal be added after the house is already built?
Yes, but it’s a different job than doing it during site work. Once landscaping, driveways, and utilities are in, loop work turns into a demolition and restoration project on top of the drilling itself. Get me looped in before excavation, not after the sod goes down.
How much yard do I need for a loop?
It depends on whether the lot supports a horizontal trench field or a vertical bore field, which comes down to lot size and setbacks more than house square footage. I look at the actual lot plan, not a rule of thumb.
Does the loop have to go in before the slab, or can it wait until framing?
It has to go in while the ground is open, which on most schedules means during excavation and site work, ahead of the foundation pour. The interior piping run to the mechanical room happens later, during rough-in. The loop itself is a site work item.
Who actually drills the loop, you or somebody else?
I bring in a driller I trust for that part of the job. Drilling is its own licensed trade in Oklahoma: the Water Resources Board requires a commercial driller and plugger license for heat exchange wells. I coordinate that crew’s schedule with yours.
What has to be decided before the slab pours?
Tonnage, loop type, where the header pipes enter the house, and where the mechanical room sits. All four get harder and pricier to change once concrete is down, so I want those answers before excavation starts.
Do you handle builds outside Kingfisher?
Geothermal is statewide. I’ll travel for a loop job anywhere in Oklahoma. My day to day HVAC service area is Kingfisher, Canadian, Oklahoma, Garfield, Major, Logan, and Blaine counties, so outside those seven for a standard service call, geothermal is still on the table, just ask.
Ready To Put Geothermal On Your Build Schedule
If you’re framing out a build schedule and a buyer wants geothermal, call me before site work gets scheduled, not after. Call 405-375-4822 or start at hartzellsheatair.com and I’ll walk your build calendar with you before the excavator shows up.
