Can an Existing Geothermal Ground Loop Be Reused?

Short answer: Usually, yes. When I replace a geothermal unit at Hartzell’s Heat & Air, the loop normally stays: I have loops in the ground on their third generation of equipment, and I have not replaced a loop field in 700+ geothermal jobs. It still has to prove itself first: hold pressure, move enough flow, and have the right freeze protection.

Why can a geothermal loop outlast the heat pump?

Because the loop and the unit wear out on different clocks. The Plastics Pipe Institute puts the design life of heat-fused HDPE ground loop pipe at typically more than 50 years, and Pacific Northwest National Laboratory notes closed loops “can have 50-year warranties.” The heat pump above it has a compressor, a blower, a board and a pump, and those are the parts that wear. That is why, in my book, a geothermal “replacement” means the unit, not the loop.

“We don’t replace the loops. They last.”Dave Hartzell, Hartzell’s Heat & Air, Kingfisher

What has to be checked before an existing loop is reused?

A long design life does not mean every loop is good. I test it before I put a new unit on it. Here is what I look at, and the ClimateMaster or industry standard behind each one:

Reuse checkGood signStop and look closer
PressureThe loop holds pressure after it is isolated and tested.Pressure keeps falling, or air keeps coming back.
FlowThe loop and pump deliver the flow the new unit needs, 2.25 to 3 gpm per ton per ClimateMaster.Low flow, a worn pump, or headers too small for the new unit.
Freeze protectionAntifreeze type and strength are known and checked with a hydrometer.Unknown mix, or protection that does not reach 15°F below the coldest expected loop temperature.
Pipe and jointsHeat-fused polyethylene in the ground.Unknown pipe, threaded plastic-to-metal fittings in the ground, or past repairs nobody wrote down.
Size matchA heat load calculation says the new unit fits what the loop can deliver.The house grew, or the new unit is bigger than the loop was designed for.

Pressure comes first. ClimateMaster’s loop leak bulletin has the inside piping and the outside loop tested separately, isolated at the flow center, so a leak in the house is never blamed on the ground. Then flow and purging: ClimateMaster calls for flushing at 2 feet per second with a flush cart and 100-micron filtration, and says a loop is clean of air only when a dead-head test drops the fluid 3/8 inch or less.

Does a bigger new unit need a bigger loop?

It can. A loop is sized for a load, and if the house grew, or the new heat pump is larger than the old one, the old loop may not carry it. I do not size the new unit off the old unit’s tonnage. I run a heat load calculation on the house, ASHRAE and ACCA Manual J methods, then check whether the existing loop can deliver the flow and temperatures that unit needs. When it cannot, the fix can be adding loop to what is already there.

What does reusing a loop mean for cost in Oklahoma?

It changes the job. The loop is a big share of a new geothermal install, and a sound loop does not have to be bought twice. If the unit itself is worth saving, a geothermal rebuild at Hartzell’s starts at $3,500 installed, with up to a 5-year warranty when the loop verifies good. If the unit is done, a replacement on the existing loop is priced in writing after I see it, and the estimate on a new system is free. A failed unit gets a $348 flat geothermal diagnostic first, any hour, and the same $348 for plan members. That covers loop pressure, refrigerant charge, the desuperheater, controls and the heat exchanger, with a written report and a quote before I leave.

Can I reuse a loop someone else installed?

Often. Most of the geothermal systems I service on homes, farms and acreages across Oklahoma were put in by someone else. What matters is the testing above, plus any paperwork you can find. Records make the call faster, and missing records just mean I test more. I am IGSHPA Accredited and a ClimateMaster GeoElite dealer, with 4.8 stars and 300+ Google reviews, and I work geothermal across Oklahoma out of Kingfisher.

What you can gather, and what to leave alone

  • Old install records, a loop map, bore or trench notes, and service tickets.
  • The model numbers of the old unit and the flow center.
  • Anything you know about past leaks, pump replacements or antifreeze work.

Leave alone: cutting, capping, opening or filling loop piping. And do not buy a replacement unit off the old unit’s tonnage before a load calculation.

Related: why loop pressure changes with temperature, reading EWT, LWT, GPM and delta T.

Geothermal loop reuse questions

Can I keep my geothermal loop when I replace the heat pump?

Usually, yes, if it tests good. At Hartzell’s Heat & Air a geothermal replacement means the unit, not the loop. In 700+ geothermal jobs in my records since 2017 I have not replaced a loop field, and I have loops on their third generation of equipment.

How long does a geothermal ground loop last?

The Plastics Pipe Institute puts the design life of HDPE ground loop pipe at typically more than 50 years, and PNNL notes closed loops can carry 50-year warranties. Design life is not a guarantee, so a loop is tested before it is reused.

How do you test an old geothermal loop?

Isolate it and pressure test the inside piping and the outside loop separately, check flow against what the new unit needs, check antifreeze strength with a hydrometer, and purge air until ClimateMaster’s dead-head test shows a drop of 3/8 inch or less.

Can old antifreeze stay in the loop?

Sometimes. The type and strength have to be known and checked. ClimateMaster calls for freeze protection to 15 degrees below the lowest expected loop temperature, measured with a hydrometer.

Should the new unit be the same size as the old one?

Not automatically. I run a heat load calculation on the house before I size the new unit, then check that the loop can deliver the flow and temperatures that unit needs. Sizing off the old unit’s tonnage is a guess.

What does a geothermal diagnostic cost before a loop reuse decision?

My geothermal diagnostic is $348 flat, any hour, and the same for plan members. If the unit is worth saving, a geothermal rebuild starts at $3,500 installed. A new-system estimate is free. Call 405-375-4822.

Sources

Test steps and ranges come from ClimateMaster and the other sources below. Job counts come from my service records since 2017, rounded down. Every loop is judged on its own test results.

Scroll to Top
Recent Jobs · 6,500+ Jobs Done
Call 405-375-4822 Book Online